Quick option installation:
This option, you will place safety pins in the places of those sewing pins at the interval of (1:05mn – 3:00mn) step-1 of this video for fast mouth installation. You apply the interval of (5:21mn – 5:48mn) of the video to trim and cutting around your handle. If you satisfy with this option, you do not need all the rest of the other three steps (step-2 to step-4). The safety pins method may take less than 10 minutes for the mouth’s installation. In this case, you may still follow the demo video installation and apply all the foldings and cuttings of those examples to your particular metal frame. Keep in mind that you will use safety pins to hold permanently those 3 layer where you fold on both sides of the upper right and left (for smaller metal frames) as the demo video. There, at the upper frame you will fold at the frame the 3 layers to 6 layer and use safety pins for the 6 layers to hold you metal frame. Then, there will be only two layers of material through the rest of the three corners of the metal frame and that is easy to place safety pins on.
The Standard installation option for the Snap Buttons:
You follows the whole demo video and finish all the steps (step-1 to step-4) to apply the snap button installation to your particular frame.
Note:
Safety pins can also use to hold the mouth block as shown by the snap button by the demo video. You may not need to put the Velcro as presenting at the later part of the demo video. The mouth block can be used to cover or block the whole mouth of the Big Leaf Bag while standing the Big Leaf Bag on it (check V-3 video at the time frame of 1:00mn-1:04mn).